Boxberg Detonation

MB Spezialabbruch - Milestones: Boxberg detonation

At the Boxberg, two 300-meter chimneys were demolished by nearly simultaneous folding detonation. A total of around 500 kilograms of explosives were used.

Continue reading

DriveBreaker

MB Spezialabbruch - Milestones: DriveBreaker

The Drive Breaker is a subsequent development of our Spider Excavator, which features greater flexibility in how it can be used.

Continue reading

Spider excavator

MB Spezialabbruch - Milestones: Spider excavator

The Spider Excavator has six height-adjustable legs, which can compensate for the different levels of the demolition edge during the dismantling process.

Continue reading

Project: Hotel Charlotte

MB Spezialabbruch - Projects: Hotel Charlotte - Selective dismantling & securing of building components of „Charlotte“ hotel, Bad Liebenstein

For the long-vacant Hotel Charlotte in Bad Liebenstein, the building structure is now being selectively dismantled and the building components on the listed ground floor are being secured.

Continue reading