PROJECTS

Our projects are numerous and diverse. Combined heat and power plants, cooling towers, chimneys… No structure is too big for us and no task is too difficult. We rise to meet every challenge.

Our references

We wrote about some of our projects in greater detail below. Get a better idea of our work.

2024

Chimney dismantling, Westerwald

Dismantling an industrial chimney and the flue gas duct with our special equipment

2023

Partial Cooling Tower Remediation

Clearing the cooling tower cup base using a radio-controlled demolition robot

2023

Former dairy complex, Berka/Werra

Selective chimney dismantling using a crane-guided system

2022

Brick chimney, Ulm

Selective chimney dismantling using a crane-guided system

2022

Former radio tower, Karlsruhe

Pre-weakening and dismantling by using a remote-handled, remote-controlled excavator

2020

Hotel Charlotte, Bad Liebenstein

Selective dismantling of the building structure and securing of building components on the listed first floor

2019

Jena CHP, Winzerla

Machine-based dismantling of 225 m reinforced concrete chimney using DriveBreaker and Spider Excavator

2019

Lubmin NPP, Greifswald

Dismantling of 100 m using wire saw technology and recycling of concrete and steel.

2018-2019

Mülheim-Kärlich NPP

Dismantling of 165 m natural draft cooling tower in a machine-based, automated, and unmanned demolition process by using the RDB 100

Would you like to see us in action? Then take a look at our downloads. You can find useful documents and interesting press articles there, as well as various videos of some of our projects.

The right solution for your project

Whatever work you need done: We can handle it. With unique, secure, and clean technologies and processes, we can handle even the most difficult tasks.

Additional work

A clear overview of projects that we have completed so far.

2020-

2010-2019

Time frame
Project
Pictures
2019
Lubmin NPP, demolition of North II ventilation stack
Dismantling from 100 m to 0.00 m
Preparation of demolition technology and risk assessment
Low-emission demolition process using wire saw technology
The concrete produced during dismantling was subsequently made available again to the construction industry as a raw material.
2019
Jena CHP, demolition of 225 m chimney
Machine-based dismantling using DriveBreaker and Spider Excavator
2018 – 2019
Mülheim-Kärlich NPP, dismantling 162 m natural draft cooling tower
Machine-based, automated, and unmanned demolition through the use of the RDB 100
2018
Dresden-Reick CHP, demolition of 200 m chimney
Machine-based dismantling using a Spider Excavator
2018 – present
Mechlenreuth substation
New construction of 380 kV plant; construction time: from March 2018; divided into two construction phases so far

Demolition of the old 220 kV plant – 2,000 m³ of concrete including recycling for reuse; Earthworks – 12,000 m³
2017 – present
Irsching substation
New construction 380 kV – plant; construction time: from September 2017; so far divided into three construction phases

Dismantling of the old 220 kV plant – 6,000 m³ concrete including recycling for reuse
2017 – 2018
Lubmin NPP Plant IV
Preparation of demolition technology and risk assessment;
Construction of a track system for two cranes at a height of 50 m on block 7/8;
Dismantling of device building superstructure including roof slabs and wall slabs from 50 m to 21 m above ground;
Removal of reactor vessel 7/8;
Removal of 2 gantry cranes with a mass of approx. 350 t at a height of 45 m;
Dismantling of North IV stack from 100 m to 50 m including foundation pedestal at a height of 50 m
2016
Lubmin NPP, demolition of North I ventilation stack
Preparation of demolition technology and risk assessment;
Demolition of 100 m down to 0.00 m using crane-guided demolition shears;
Real-time image data transmission from demolition zone to ground-based equipment (crane and excavator)
2016 – present
Gießen substation
New construction of 380 kV plant; construction time: from November 2016; so far divided into four construction phases

Dismantling of the old 220 kV plant – 12,000 m³ concrete including recycling for reuse
2015
Exxon Mobil, Steyerberg-Vogtei
Dismantling of 2 x 140 m reinforced concrete chimney
2014
KVA Areal Warmbächliweg [Refuse Incineration Plant], Bern, Switzerland
Dismantling of 3 x 85 m reinforced concrete chimney
2012 – 2013
Iberdrola, Bilbao, Spain
Dismantling of 1 x 186 m reinforced concrete chimney
Dismantling of 1 x 156 m reinforced concrete chimney
2011
WSW Wuppertal
Dismantling of 137 m brick chimney

2000-2009

Time frame
Project
2009
Wienstrom, Vienna, Austria
Dismantling of 1 x 200 m reinforced concrete chimney
Dismantling of 1 x 120 m reinforced concrete chimney
2008
Steelworks, Komsomolsk, Russia
Dismantling of 180 m reinforced concrete chimney
2008
Borregaard Paper Factory, Norway
Dismantling of 164 m reinforced concrete chimney
2007
VKG Oil AG, Kothla-Järve, Estonia
Dismantling of 105 m reinforced concrete chimney
2007
Gotha Boxberg
Blasting 2 x 300 m stack
2006
Breitungen CHP II
Blast folding 200 m chimney
2006
Thyssen Krupp Stahl, Duisburg
Dismantling of 3 x 80 m brick chimney
Dismantling of 1 x 90 m brick chimney
Dismantling of 2 x 136 m brick chimney
2006
E.ON, Landesbergen
Dismantling of 180 m reinforced concrete chimney
2005
Enelpower, La Casella, Italy
Dismantling of 2 x 200 m reinforced concrete chimney
2002
BASF, Ludwigshafen
Dismantling of 200 m reinforced concrete chimney

Give us a call