Our specially designed dismantling concept is used for selective chimney dismantling in the Westerwald.
Continue readingProjects: Partial Cooling Tower Remediation
Using a specially developed radio-controlled demolition robot, MB Spezialabbruch safely and quickly a cooling tower cup.
Continue readingProjects: Demolition of the former dairy in Berka/Werra
Since 2012 the former dairy in Werra-Suhl-Tal is getting dismantled. MB Spezialabbruch was commissioned to demolish the 4th construction section.
Continue readingProjects: Selective chimney dismantling in Ulm
Our self-developed, crane-guided scaffolding system was used to safely dismantle the 70 meter high chimney.
Continue readingProjects: Radio tower Karlsruhe
In February 2022, we dismantled a former radio tower using a remote-controlled, radio-controlled excavator.
Continue readingProject: Chimney, Aschaffenburg
For our customer, we used our special equipment to selectively dismantle a chimney to a height of 6 m above ground level.
Continue readingProject: Hotel Charlotte
For the long-vacant Hotel Charlotte in Bad Liebenstein, the building structure is now being selectively dismantled and the building components on the listed ground floor are being secured.
Continue readingProject: Lubmin NPP
The Lubmin NPP near Greifswald was dismantled from 100 to 0 meters using low-emission wire saw technology. The concrete produced during dismantling was recycled.
Continue readingProject: Mülheim-Kärlich NPP
Due to the high safety requirements, special technology was used for dismantling the Mülheim-Kärlich NPP’s cooling tower.
Continue readingProject: Jena CHP
In 2019, the demolition work began on the 225 m reinforced concrete chimney of the Jena CHP in Winzerla.
Continue reading