Development: RDB 100i

Research project: MAMA - Machine-based, automated, unmanned demolition process

Together with the TU Dresden and IBL-hydronic, we are working on the MAMA process (machine-based, automated, unmanned, demolition process) for the RDB 100i.

Continue reading

Sequential Collapse

MB Spezialabbruch - Demolition and dismantling without the use of explosives

We have successfully applied the method of a safely induced controlled sequential collapse for the demolition of the cooling tower of the nuclear power plant in Mülheim-Kärlich.

Continue reading

RDB 100

MB Spezialabbruch - Milestones: RDB 100

The RDB 100 enables unmanned, remote-controlled demolition of tall structures with a linear structure and offers increased safety for personnel.

Continue reading

Drop Anchor

MB Spezialabbruch - Milestones: Drop anchor

The heavy-duty fastening device (drop anchor) is used to fasten loads to building structures where the wall panel has to be anchored.

Continue reading

Hydroshield

MB Spezialabbruch - Milestones: Hydroshield / Hydrocontainer

The Hydroshield is a barrier created with water in a container, which is used to clean air contaminated with suspended particles.

Continue reading

Crane Track

MB Spezialabbruch - Milestones: Lubmin Crane track

In spring 2017, the dismantling work began on Units 7 and 8 of Plant IV of the Lubmin / Greifswald NPP using a specially designed crane track.

Continue reading

Wire Saw

MB Spezialabbruch - Milestones: Wire saw

A wire saw is often used to process components with large cutting depths and to cut tubular structures to size.

Continue reading

Wall Saw

MB Spezialabbruch - Milestones: Wall saw

Saw blades with a diameter of up to 1,600 millimeters are used for the wall saw, which allows for cutting depths of up to 730 millimeters.

Continue reading